Product Details:
Payment & Shipping Terms:
|
Voltage: | 380V 50HZ 3phase | Weight: | 8500 Kg |
---|---|---|---|
Roller Material: | 45# Steel Chrome | Thickness: | 1.5-3MM |
Cutting Type: | Hydraulic Cutting | Control System: | PLC |
Key Selling Points: | Automatic | Production Capacity: | 30 M/min |
Main Motor Power: | 7.5kw | ||
High Light: | C Purlin Shape Cold Making Machine,Small Size c purlin shape machine,Hydraulic c purlin shape machine |
CZ Purlin High Speed Roll Forming Machine Automatic Changing Size Channel
Where are our company C/Z purlin interchangeable roll forming machine diffience from other compititor: 1.The finished purlin has high straight level and high crush resistance ability. 2.The finished Z purlin can be lap reversely.The connection point improve strength. 3.Use reduce motor and frequency to control, the speed length and location can be control. 4.Interchangeable progress between C and Z is fast and easy.
Many houses use purlins to lift the rafters to support the rafters. The purlins are made into roof beams, and the paving and tiles are placed on the roof truss or diagonal beams of the house. The steel purlin from purlin machine is lighter in size, which is in
line with the characteristics of the roof purlin
the product can be used as medium-sized industrial and civil buildings the main force structure, such as factories, warehouses, machine garages, hangars, exhibition halls, theaters, stadiums, fairs Shed roof and wall flat load bearing support.
specifications
Main motor power
|
7.5kw
|
Hydraulic motor power
|
4kw
|
Hydraulic Pressure
|
10-12MPa
|
Voltage
|
380V/50HZ/3Phase
|
Control System
|
PLC (Delta brand)
|
Feeding Material
|
Galvanized steel
|
Feeding Thickness
|
1.5-4.0mm
|
Speed
|
30-50m/min
|
Roller station
|
18 rows
|
Shaft diameter
|
80mm
|
Shaft material
|
45# steel
|
Roller material
|
45# steel
|
Cutter material
|
Cr12 quenched
|
Dimension
|
11000*1200*1500mm
|
Weight
|
about 6700 kg
|
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
Contact Person: Mr. Ryan
Tel: +8615100375273
Fax: 86-317-2016816