Product Details:
Payment & Shipping Terms:
|
Product Name: | GI Steel Floor Decking Roll Forming Machine For Construction Material | Cutting Blade Material: | Cr12 Quenched |
---|---|---|---|
Machine Frame: | 400H Or 450H Steel | Shaft Material: | High Grade No.45 Forged |
Weight: | 5000kg | Voltage: | 380V 50Hz 3phases |
Production Capacity: | 15-20m/min | Sidewall Structure: | 20mm |
High Light: | GI Steel Deck Roll Forming Machine,GI Steel Floor Decking Roll Forming Machine,20m/min Steel Deck Roll Forming Machine |
GI Steel Floor Decking Roll Forming Machine For Construction Material
Uncoiling the sheet---Infeed guiding--Roll forming---Rectifying the straightness---Measure length---Cutting the panel--panels to the supporter (option: automatic stacker)
The advantage of glazed steel sheet includes beautiful, classical appearance and grace taste. It is widely used in village, hotel, exhibition, vacation village, family construction and outdoor decorating. The floor deck roll forming machine can form the flat sheet into a customized shape, the raw amterial is gi,ppgi,color steel.
T
Specification
floor decking roll forming Machine Specifications | |
Weight | About 2.5tons |
Size | About 12.5mx1.5mx1.3m(length x width x height) |
Color | Machine Main color: blue or can as your requirement |
Warning color: yellow | |
Suitable Raw Material | |
Material | Galvanized Steel Coils,color steel |
Thickness | 0.8-1.5mm |
Yield Strength | 235Mpa |
Main Technical Parameters | |
Quantity of forming rollers stations | 19stations |
Diameter of forming rollers shafts | 75mm |
Roll Forming Speed | 15-20m/min |
Forming rollers material | No.45 steel, coated with chromed treatment |
Cutter material | CR12 mould steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric Power requirement | Main motor power: 13.5kw+13.5kw |
Hydraulic unit motor power: 5.5kw | |
Electric voltage | According to customer’s requirement |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
Contact Person: Mr. Ryan
Tel: +8615100375273
Fax: 86-317-2016816