Place of Origin:
China
Brand Name:
FMS
Certification:
CE,ISO
Model Number:
C Purlin
Full Automated Drywall Roll Forming Machine CZ Channel Purlin Roll Forming Machine
Changing C to Z:
1) Changing size: automatic,change sizes by press button.
2) Adjust the screw pole manually to adjust the distance between upper and lower rollers to form different thickness product
3) Quick change C to Z
Purlin in any size can be made without changing cutting molds. It’s different from traditional cutting device
It is suitable for industrial and civilian buildings, warehouses, special buildings, large -span steel structured roofs, wall surfaces, and internal and external wall decorations. It has light quality, high -strength, rich color, convenient construction, earthquake resistance, fire prevention, rainproof, life span The characteristics of long, exempt maintenance, have been widely promoted and applied to the color steel encirclement building system
specifications
Item Name | Specification | |
1 | Effective width | 80-300 mm |
2 | Thickness of feeding material | 1-3 mm coil sheet |
3 | Roller station | 8-12 stations |
4 | Shaft Diameter | 80 mm |
5 | Productivity | 8-12 m/min |
6 | Rollers' material | 45# steel forge |
7 | Shaft material | 45# steel |
8 | Weight | 8tons |
9 | length | 8 m |
10 | Voltage | 380V 50Hz 3phases |
11 | Control | PLC |
12 | Decoiler | 5 tons |
13 | Motor | 11kw |
14 | Driving way | Chain transmission |
15 | Chain size | 1-2 inch |
16 | Cutting system | Hydraulic cutte |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
Send your inquiry directly to us