Place of Origin:
CHINA MAINLAND
Brand Name:
FMS
Certification:
ISO CE
Canada Metal Door Frame Roll Forming Machine Varable Rabbet Width
Doorframe And Fire Door Roll Forming Machine Doorframe Roll Forming Line.It can produce a structural doorframe, fire door and clean panel, doorframe roll forming line of KINDUS can automatically control according to the width of product.
Moreover, the positioning of punching is easy, regardless of a various size of fire door, inner or exterior plate.
Especially, it sequentially process inner and exterior plate, and can lead to following process.
So, fire door manufacturing process can be done continuously and then, it is not only improving productivity significantly but also the cost reduction enables to minimize of subsidiary equipment and space.
Specification
NO
|
Name
|
Quanty
|
Remark
|
1
|
5T hydrauic
Motoize decoiler |
1pc |
Max capacity:5T
|
2
|
Leveling machine
|
1 set
|
1)5.5kw frequency change driving-motor,speed adjustable 2)2 rolls feeding and 7 rolls
leveling 3) Levelling rolls dia 80mm 4)Levelling motor:4kw |
3
|
servo motor feeder
|
1set
|
Yaskawa servo-feeder.3kw 2)Feeding distance can be
adjustable |
4
|
Hydraulic Punching
frame |
3sets
|
Motor:11kw
|
5
|
Punching mould for
lock set |
1set
|
Punching mould material:
Cr12 Mov. |
6
|
Punching mould for
hinge set |
1 set
|
Punching mould
material:Cr12 Mov. |
7
|
Punching mould for 45 degree mitre
cut |
3 sets
|
Punching mould material:Cr12 Mov.
|
8
|
Main forming Machine unit
|
1set
|
17 forming stations with Torri stands
|
9
|
Hydraulic cutting
|
1set
|
Stop to cut
|
10
|
Cutting blade
|
3 sets
|
Cr12Mov,HCR58-62
|
11
|
Run-out table
|
2pcs
|
2m long Steel frame with
Rollers |
12
|
Electric panel
|
2sets
|
PLC control system,Panasonic
|
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
Send your inquiry directly to us