Product Details:
Payment & Shipping Terms:
|
Product Name: | Water Down Pipe Roll Forming Machine Downpipe Making Production Line | Diameter Of Shafts: | 70mm |
---|---|---|---|
Voltage: | 380V 50Hz 3phases | Speed: | 10-15m/min |
Core Components: | Motor, Pump, PLC | Warranty: | 1 Year |
Material Of Rollers: | 45#, Surface Hard Chromium Plating | Width: | 300mm |
High Light: | 70mm down pipe roll forming machine,ce down pipe roll forming machine,cold metal shaping downpipe machine |
Water Down Pipe Roll Forming Machine Downpipe Making Production Line
Downpipe Making Production Line down Pipe Roll Forming Machine,whole line consist manual decoiler,main forming machine,control box,hydraulic pump and run out table
1.The whole line working speed is about 10m/min.,max working speed could be 15 meters per minute.
2.Feeding material width should be confirmed before machine design .the width are changeable,
3.Material thickness normal range are 0.3-0.8mm.if you have any special request on material thickness,we should discuss in advance .
4.Both three and four waves are suitable for the line.we can design the machine based on buyer's profile drawing
5.Final sheet embossing is avaliable.we can different embossing rollers on various pattern and drawings.
6.Pre-cutting are provided as you want.
uitable Material | Material | GI, PPGI, PPGL |
Width | 300mm | |
Thickness | 0.3-0.8 mm | |
Material of rollers | 45#, surface hard chromium plating | |
Rows of rollers | 16 stations | |
Material of shafts | High grade 45# forged steel | |
Diameter of shafts | 70 mm | |
Material of cutting blade | Cr12 Heat Treatment | |
Speed | 10-15m/min | |
Side plate thickness | 18 mm | |
Main power | 5.5 kw | |
Voltage | 380V 50HZ 3Phase | |
Appearance size (About) | 4000mm*1000mm*1500mm | |
Weight(About) | 5.8 tons |
Guarantee
1.Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
Contact Person: Jacky Xiao
Tel: +8615733710919