Place of Origin:
CHINA MAINLAND
Brand Name:
FMS
Certification:
ISO CE
Model Number:
Door Frame
105 Dura Metal Palisade Fence Roll Forming Machine Automated
1.The system is easy to operate and use. PLC: Delta(Can customize as customer require)
2.The surface of the final product is very smooth and beautiful without any scratch on the surface.
Specification
No.
|
105 dura metal palisade fence roll forming machine
|
|
1
|
Suitable to process
|
Color alu-zinc steel strips
|
2
|
Roller
|
15 Rows plus leveling device
|
3
|
Dimensions
|
5.8*1*1.5m
|
4
|
Motor Power
|
3Kw
|
5
|
Pump Station Motor
|
4Kw.Lichao Brand
|
6
|
Thickness of the plate
|
0.3-0.8mm
|
7
|
Productivity
|
10-15m/min
|
8
|
Material of the cutting blade
|
Cr12,Quenched treatment 58℃-60℃
|
9
|
Diameter of the roller
|
Φ70mm
|
10
|
Weight
|
About 2600kgs
|
11
|
Main structure of the machine
|
Square steel frame
|
12
|
Processing precision
|
Within 1.0mm
|
13
|
Side panel of machine
|
16mm
|
14
|
Chain Wheel and Cycle Chain
|
1 Inch
|
15
|
Voltage
|
380V 50Hz 3phases or as customer's need
|
16
|
Control system
|
PLC control (Delta)
|
17
|
Frequency system
|
Delta
|
18
|
Drive mode
|
Gear driver
|
19
|
Touch screen
|
Delta
|
20
|
Rolling materials
|
45# forging steel with chromium plate
|
21
|
Length Tolerance
|
±2mm
|
Application
The door frame forming machine is used in conjunction with the rolling shutter door strip forming machine, which is suitable for commercial exterior walls, garages, shopping malls, factories, mining enterprises and other public places or residences. Especially in places with large door openings, where it is not convenient to install the door body on the ground, it plays a role of convenient and quick opening of the door. For example, it is used for garage doors, fireproof rolling shutter doors of shopping malls, hangar doors, etc.
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
Send your inquiry directly to us