Product Details:
Payment & Shipping Terms:
|
Product Name: | Half Round Water Steel Rain Gutter Roll Forming Machine Automatic Seamless | Raw Material: | Galvalume, Galvanized, PPGI,Aluminum,Copper |
---|---|---|---|
Voltage: | 380V 50Hz 3phases | Suitable To Process: | Color Steel Plate |
Control System: | PLC | Usage: | Water Gutter For Roof |
Width Of The Plate: | 200-600mm | Rollers: | 14-16rows |
High Light: | ppgi rain gutter roll forming machine,seamless rain gutter roll forming machine,ppgi rain gutter making machine |
Half Round Water Steel Rain Gutter Roll Forming Machine Automatic Seamless
gutter cold roll forming machine can bend the roll formed pipe, and let the drainpipe and the bending connect to be the whole.The product after roll forming has long working time than the tranditional ppc pipe, and not aging. It can make the project more integrate, and help to enhance the image of the all project.
gutter cold roll forming machine is composed of uncoiler, the feed leading table, the main machine, the formation cutting device, hydraulic system, control system and the product bracket.
Specification
Name
|
New tech gutter machine
|
Processing Material
|
Colored steel plate, galvanized plate, or aluminium plate
|
Rollers
|
14-16rows
|
Equipment operation
|
Automatically
|
Dimensions
|
8.6*0.8*1.2m
|
Power
|
4+3kw
|
Productivity
|
8-12m/min
|
Material of Rollers
|
45# steel, surface hard chromium plating.
|
Diameter of the roller
|
52mm
|
Application
This produc has the advantages of easy installation, short construction period, beautiful appearance, light weight but high strength.so it's widely used in roofs and walls of factories, warehouses, garages, stadiums, exhibition centers, cinemas, theaters, etc.
Guarantee
1.Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms and delivery
40% in advance as down payment
60% is paid before the shipment is processed
The Delivery Time: 30 days after the down payment is received.
Contact Person: Mr. Ryan
Tel: +8615100375273
Fax: 86-317-2016816