Product Details:
Payment & Shipping Terms:
|
Product Name: | Two Waves Highway Guardrail Roll Forming Machine Beams Crash Barrier | After-sales Service Provided: | Engineers Available To Service Machinery Overseas,Online Support,Video Technical Support,Free Spare Parts,Field Maintenance And Repair Service |
---|---|---|---|
Forming Stations: | According To You Profile Drawings | Rollers Material: | GCr15,Cr12,SKD11 Quenching Treatment:HRC58-62(optional) |
Voltage: | 380V.50HZ.3Phase | Control: | PLC |
Way Of Drive: | Chain Drive,Gearbox Drive(optional) | Raw Material Request: | Cold Rolled Or Hot Rolled Steel,galvanized Steel,SS316L/Mild Steel |
High Light: | plc crash barrier roll forming machine,chaindrive crash barrier roll forming machine,chain drive guardrail roll forming machine |
Two Waves Highway Guardrail Roll Forming Machine Beams Crash Barrier
Highway Guardrail plate is mainly used in national high-speed railway, highway road reconstruction projects and industrial hardware products and other industries. When subjected to external forces, the deformation of guardrail plate and column can absorb impact force to protect pedestrians and vehicles.Is a common road safety emergency protection facilities.
Specification
No. | Item | Description |
1 | Coil |
Q235MPA Steel |
2 | Material Thickness | 3 mm |
3 | Working Speed | 10- 15 m/min ( not including the cutting time) |
4 | Roller Station | 13 Raws |
5 |
PLC |
Yaskawa,Siemens,Mitsubishi, panasonic (option Brand) |
6 |
Whole line working speed |
0-25m/min |
7 |
Length precision |
±0.3mm/10m |
8 |
Punching system |
hydraulic punching ,punching press machine(option) |
9 |
Cutting system |
pre cutting,hydraulic post cutting,servo Tracking cutting |
10 |
Inverter |
Yaskawa,Siemens,Mitsubishi, panasonic (option Brand) |
11 |
Cutting Accuracy |
±2 mm |
12 |
Driving Mode |
Chain |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 60 working days after the down payment is received.
Contact Person: Mrs. Tracy
Tel: +8618713641935
Fax: 86-317-2016816