Place of Origin:
CHINA MAINLAND
Brand Name:
FMS
Certification:
ISO CE
Model Number:
Highway Guardrail
Production Line Of U Post Roll Forming Machine Higher Impact Endurance
Highway Guardrail plate is mainly used in national high-speed railway, highway road reconstruction projects and industrial hardware products and other industries. When subjected to external forces, the deformation of guardrail plate and column can absorb impact force to protect pedestrians and vehicles.Is a common road safety emergency protection facilities.
It is a perfect combination of high quality material (including Q235, Q345, etc.) and excellent anti-rust zinc or PVC coating. All of these make it outstanding at long-term corrosion and rust resistance. Meanwhile, it costs effectively and is widely used as a visual and physical barrier for protection against run-off road collision. Additionally, it is often used as a specific signs for a transition to high speed roadways, bridges, etc.
Specification
No. | Item | Description |
1 | Coil |
Q235MPA Steel |
2 | Material Thickness | 3 mm |
3 | Working Speed | 10- 15 m/min ( not including the cutting time) |
4 | Roller Station | 13 Raws |
5 |
Coil Width |
≤400-600 mm |
6 |
Length precision |
±0.3mm/10m |
7 |
Punching system |
hydraulic punching ,punching press machine(option) |
8 |
Cutting system |
pre cutting,hydraulic post cutting,servo Tracking cutting |
9 |
Inverter |
Yaskawa,Siemens,Mitsubishi, panasonic (option Brand) |
10 |
PLC |
Yaskawa,Siemens,Mitsubishi, panasonic (option Brand) |
11 |
Cutting Accuracy |
±2 mm |
12 |
Driving Mode |
Chain |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 60 working days after the down payment is received.
Send your inquiry directly to us