Product Details:
Payment & Shipping Terms:
|
Product Name: | Metal Insulation Materials Construction Rock Wool Sandwich Panel Roll Forming Machine | Voltage: | 380V 50Hz 3phases,380V Or As Customize |
---|---|---|---|
Working Speed: | 10-15 M/min | Warranty: | 1 Year |
After-sales Service Provided: | Engineers Available To Service Machinery Overseas,Video Technical Support,Field Maintenance And Repair Service,Field Installation,commissioning And Training | Condition: | New |
High Light: | wall panel roll forming machine,sandwich panel production machinery |
Metal Insulation Materials Construction Rock Wool Sandwich Panel Roll Forming Machine
This equipment adopts advanced production technology, which integrates gas, electricity and machinery. It is a special mechanical equipment for processing color steel heat-insulating composite panels. The working speed is stepless speed regulation, which can produce composite panels at one time. Machine, forming machine, compound machine (crimping, glue spraying, heating, bonding, crimping, slotting, trimming, cutting) are necessary equipment for the production of roofs and wall panels in industrial plants, warehouses, etc.
Profile
PS: The machine can produce both rock wool composite plate and foam composite board.
Specification
No. | Item | Description |
1 |
Dimensions (L*W*H) |
400000 mm*2250 mm*2500 m |
2 | Steel Thickness | 0.25 mm- 0.8 mm |
3 | Sandwich Panel Thickenss | 50 mm - 300 mm |
4 | Roller Station |
Up layer: 13 rows. Down layer: 14 rows |
5 |
Working Speed |
4 m /min |
6 |
Power |
Main motor power: 4kw . Flying saw power: 2*0.75kw |
7 |
Total Power |
32 KW |
8 |
Machine Weight |
22 tons |
9 |
Steel Coil Width |
1000 mm 1200 mm 1250 mm |
10 |
Hydraulic motor power |
15 kw |
11 |
Cutting Accuracy |
±2 mm |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 45 working days after the down payment is received.
Contact Person: Mr. Ryan
Tel: +8615100375273
Fax: 86-317-2016816